clock menu more-arrow no yes mobile

Filed under:

Consider This Unfinished Greenwood Basement Now Finished




Project Name: Craftsman Basement
Location: Greenwood
Professional: Woodcrafters Construction, Lakecity Plumbing, Queen Anne Electric, GFR Heating, Phinney Ridge Cabinets
Timeframe: Four months
Cost: $98K
Description: The remodel was for a growing family that needed space in their existing house by finishing the previously unfinished 1,150 sf basement. The project utilized steel flush beams in the ceiling to open up the space, soundproof insulation in the walls and ceilings for noise control, a Navian high efficiency tank-less water heater with a re-circulating pump, solid-core craftsman style doors, & period-correct trim, lighting, & plumbing fixture details.


· Greenwood Craftsman Basement [Porch]
· All Extreme Makeovers coverage [Curbed Seattle]